Case Studies

ADM Milling - Knottingley

Roomfoss designed and delivered a 17-column Form4 Type 6 Schneider Okken switchboard with advanced features, ensuring that the solution met ADM Milling's complex requirements.

Dow Silicones

Dow silicones motor control centre

Roomfoss Control Systems were tasked with building a motor control centre for their Secondary waste water treatment (SWWT) plant. This would need to control and monitor mixers, pumps and fans.

Eastern Power Systems (EPS)

The outside of James Paget Hospital community diagnostic centre

EPS tasked Roomfoss Control Systems with designing and building a power distribution system capable of maintaining power supply during mains failure conditions for James Paget University Hospital's North Substation Expansion.

Pretoria Energy

AD Plant

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Transport For London (TFL)

Silvertown LV Switchboard Overview Panel

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Witham Fourth

This is an image of

Roomfoss were selected to survey, design and build a replacement multiple pump control system for Witham Fourth District Internal Drainage Board exercising our skill in integrating pre-existing pumps and cabling with a new system.